ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (2024)

Table of Contents
ITN Final Skills Exam (PTSA) ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key Download PDF & Packet Tracer files: ITN Final Skills Exam (PTSA) - ID: 002 - Last Updated: Aug 2021 ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key - 100% Score Download PDF & Packet Tracer files: ITN Final Skills Exam (PTSA) ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key Download PDF & Packet Tracer files: ITN Final Skills Exam (PTSA) ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key - 100% Score Download PDF & Packet Tracer files: ITN Final Skills Exam (PTSA) ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key Download PDF & Packet Tracer files: ITN Final Skills Exam (PTSA) ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key - 100% Score Download PDF & Packet Tracer files: ITN Final Skills Exam (PTSA) ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key Download PDF & Packet Tracer files: ITN Final Skills Exam (PTSA) ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key Download PDF & Packet Tracer files: ITN Final Skills Exam (PTSA) ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key - 100% Score Download PDF & Packet Tracer files: ITN Final Skills Exam (PTSA) ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key - 100% Score Download PDF & Packet Tracer files: ITN Final Skills Exam (PTSA) ITN Final PT Skills Assessment (PTSA) Assessment Objectives Instructions Answers Key - 100% Score Download PDF & Packet Tracer files: References

ITN Final Skills Exam (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (1)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1R1
S1S1
PC-APC-A
PC-BPC-B

Addressing Requirements Table

ItemRequirements
Network Address192.168.10.0/24
LAN 1 subnet host requirements100
LAN 2 subnet host requirements50
R1 G0/0/1First host address in LAN 1 subnet
R1 G0/0/0First host address in LAN 2 subnet
S1 SVISecond host address in LAN 1 subnet
PC-ALast host address in LAN 1 subnet
PC-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (2)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on R1 and S1
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the R1 router and S1 switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 192.168.10.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 100 hosts and the smaller subnet (LAN 2) requires 50 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 192.168.10.0/24
  • Required number of hosts in IPv4 LAN 1: 100
  • Required number of hosts in IPv4 LAN 2: 50

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on R1 G0/0/1
  • LAN 2 is hosted on R1 G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to S1 SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on R1 and S1
b. Configure router hostname using the name R1.
c. Configure switch hostname using the name S1.
d. Configure an appropriate banner on R1 and S1.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure R1 G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the S1 VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on R1 and S1

Step 1: Configure enhanced password security

a. Configure DontTellAnyone as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on R1.

Step 2: Configure SSH on R1 and S1

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on S1

a. Shut down all unused ports on S1.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 011

Answers Key

Part 1: Build the Network

Placing Switch S1 and Router R1 to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (3)

Using Copper Straight-Through cable to connect PC-A (FastEthernet0 port) and S1 (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (4)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (5)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (6)

Turn-on PCs and Router R1
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (7)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address192.168.10.0/24
LAN 1 subnet host requirements100192.168.10.0/25
SM: 255.255.255.128
LAN 2 subnet host requirements50192.168.10.128/26
SM: 255.255.255.192
R1 G0/0/1First host address in LAN 1 subnet192.168.10.1
R1 G0/0/0First host address in LAN 2 subnet192.168.10.129
S1 SVISecond host address in LAN 1 subnet192.168.10.2
PC-ALast host address in LAN 1 subnet192.168.10.126
PC-BLast host address in LAN 2 subnet192.168.10.190

Using line console to connect PC-A and Router
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (8)

Click to PC-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (9)

Router R1 configuration script

enableconfigure terminal no ip domain-lookuphostname R1banner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 192.168.10.129 255.255.255.192no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 192.168.10.1 255.255.255.128no shutdown exitenable secret DontTellAnyoneservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for Switch S1

Then, using Console cable to connect PC-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (10)

Switch S1 configuration script

enableconfigure terminal no ip domain-lookuphostname S1banner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 192.168.10.2 255.255.255.128no shutdown exitip default-gateway 192.168.10.1enable secret DontTellAnyoneservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address192.168.10.126
Subnet Mask255.255.255.128
IPv4 Default Gateway192.168.10.1

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (11)

PC-B Network Configuration
IPv4 Address192.168.10.190
Subnet Mask255.255.255.192
IPv4 Default Gateway192.168.10.129

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (12)

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (13)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN Final Skills Exam (PTSA) - ID: 002 - Last Updated: Aug 2021

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (14)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1R1
S1S1
PC-APC-A
PC-BPC-B

Addressing Requirements Table

ItemRequirements
Network Address192.168.10.0/24
LAN 1 subnet host requirements100
LAN 2 subnet host requirements50
R1 G0/0/1First host address in LAN 1 subnet
R1 G0/0/0First host address in LAN 2 subnet
S1 SVISecond host address in LAN 1 subnet
PC-ALast host address in LAN 1 subnet
PC-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (15)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on R1 and S1
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the R1 router and S1 switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 192.168.10.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 100 hosts and the smaller subnet (LAN 2) requires 50 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 192.168.10.0/24
  • Required number of hosts in IPv4 LAN 1: 100
  • Required number of hosts in IPv4 LAN 2: 50

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on R1 G0/0/1
  • LAN 2 is hosted on R1 G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to S1 SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on R1 and S1
b. Configure router hostname using the name R1.
c. Configure switch hostname using the name S1.
d. Configure an appropriate banner on R1 and S1.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure R1 G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the S1 VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on R1 and S1

Step 1: Configure enhanced password security

a. Configure NoOneShouldKnow as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on R1.

Step 2: Configure SSH on R1 and S1

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on S1

a. Shut down all unused ports on S1.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 002

Answers Key - 100% Score

Part 1: Build the Network

Placing Switch S1 and Router R1 to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (16)

Using Copper Straight-Through cable to connect PC-A (FastEthernet0 port) and S1 (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (17)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (18)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (19)

Turn-on PCs and Router R1
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (20)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address192.168.10.0/24
LAN 1 subnet host requirements100192.168.10.0/25
SM: 255.255.255.128
LAN 2 subnet host requirements50192.168.10.128/26
SM: 255.255.255.192
R1 G0/0/1First host address in LAN 1 subnet192.168.10.1
R1 G0/0/0First host address in LAN 2 subnet192.168.10.129
S1 SVISecond host address in LAN 1 subnet192.168.10.2
PC-ALast host address in LAN 1 subnet192.168.10.126
PC-BLast host address in LAN 2 subnet192.168.10.190

Configuration for router R1

Using line console to connect PC-A and Router R1
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (21)

Click to PC-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (22)

Router R1 configuration script

enableconfigure terminal no ip domain-lookuphostname R1banner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 192.168.10.129 255.255.255.192no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 192.168.10.1 255.255.255.128no shutdown exitenable secret NoOneShouldKnowservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for Switch S1

Then, using Console cable to connect User-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (23)

Switch S1 configuration script

enableconfigure terminal no ip domain-lookuphostname S1banner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 192.168.10.2 255.255.255.128no shutdown exitip default-gateway 192.168.10.1enable secret NoOneShouldKnowservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address192.168.10.126
Subnet Mask255.255.255.128
IPv4 Default Gateway192.168.10.1

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (24)

PC-B Network Configuration
IPv4 Address192.168.10.190
Subnet Mask255.255.255.192
IPv4 Default Gateway192.168.10.129

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (25)

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (26)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN Final Skills Exam (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (27)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1Central-RT
S1Central-SW
PC-AUser-A
PC-BUser-B

Addressing Requirements Table

ItemRequirements
Network Address192.168.10.0/24
LAN 1 subnet host requirements100
LAN 2 subnet host requirements50
Central-RT G0/0/1First host address in LAN 1 subnet
Central-RT G0/0/0First host address in LAN 2 subnet
Central-SW SVISecond host address in LAN 1 subnet
User-ALast host address in LAN 1 subnet
User-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (28)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on Central-RT and Central-SW
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the Central-RT router and Central-SW switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 192.168.10.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 100 hosts and the smaller subnet (LAN 2) requires 50 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 192.168.10.0/24
  • Required number of hosts in IPv4 LAN 1: 100
  • Required number of hosts in IPv4 LAN 2: 50

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on Central-RT G0/0/1
  • LAN 2 is hosted on Central-RT G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to Central-SW SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on Central-RT and Central-SW
b. Configure router hostname using the name Central-RT.
c. Configure switch hostname using the name Central-SW.
d. Configure an appropriate banner on Central-RT and Central-SW.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure Central-RT G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the Central-SW VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on Central-RT and Central-SW

Step 1: Configure enhanced password security

a. Configure NoOneShouldKnow as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on Central-RT.

Step 2: Configure SSH on Central-RT and Central-SW

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on Central-SW

a. Shut down all unused ports on Central-SW.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 012

Answers Key

Part 1: Build the Network

Placing Switch Central-SW and Router Central-RT to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (29)

Using Copper Straight-Through cable to connect User-A (FastEthernet0 port) and Central-SW (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (30)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (31)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (32)

Turn-on PCs and Router Central-RT
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (33)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address192.168.10.0/24
LAN 1 subnet host requirements100192.168.10.0/25
SM: 255.255.255.128
LAN 2 subnet host requirements50192.168.10.128/26
SM: 255.255.255.192
Central-RT G0/0/1First host address in LAN 1 subnet192.168.10.1
Central-RT G0/0/0First host address in LAN 2 subnet192.168.10.129
Central-SW SVISecond host address in LAN 1 subnet192.168.10.2
User-ALast host address in LAN 1 subnet192.168.10.126
User-BLast host address in LAN 2 subnet192.168.10.190

Using line console to connect User-A and Router
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (34)

Click to User-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (35)

Router Central-RT configuration script

enableconfigure terminal no ip domain-lookuphostname Central-RTbanner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 192.168.10.129 255.255.255.192no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 192.168.10.1 255.255.255.128no shutdown exitenable secret NoOneShouldKnowservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for Switch Central-SW

Then, using Console cable to connect User-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (36)

Switch Central-SW configuration script

enableconfigure terminal no ip domain-lookuphostname Central-SWbanner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 192.168.10.2 255.255.255.128no shutdown exitip default-gateway 192.168.10.1enable secret NoOneShouldKnowservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address192.168.10.126
Subnet Mask255.255.255.128
IPv4 Default Gateway192.168.10.1

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (37)

PC-B Network Configuration
IPv4 Address192.168.10.190
Subnet Mask255.255.255.192
IPv4 Default Gateway192.168.10.129

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (38)

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (39)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN Final Skills Exam (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (40)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1Central-RT
S1Central-SW
PC-AUser-A
PC-BUser-B

Addressing Requirements Table

ItemRequirements
Network Address209.165.201.0/24
LAN 1 subnet host requirements29
LAN 2 subnet host requirements17
Central-RT G0/0/1First host address in LAN 1 subnet
Central-RT G0/0/0First host address in LAN 2 subnet
Central-SW SVISecond host address in LAN 1 subnet
User-ALast host address in LAN 1 subnet
User-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (41)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on Central-RT and Central-SW
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the Central-RT router and Central-SW switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 209.165.201.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 29 hosts and the smaller subnet (LAN 2) requires 17 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 209.165.201.0/24
  • Required number of hosts in IPv4 LAN 1: 29
  • Required number of hosts in IPv4 LAN 2: 17

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on Central-RT G0/0/1
  • LAN 2 is hosted on Central-RT G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to Central-SW SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on Central-RT and Central-SW
b. Configure router hostname using the name Central-RT.
c. Configure switch hostname using the name Central-SW.
d. Configure an appropriate banner on Central-RT and Central-SW.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure Central-RT G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the Central-SW VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on Central-RT and Central-SW

Step 1: Configure enhanced password security

a. Configure NoOneShouldKnow as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on Central-RT.

Step 2: Configure SSH on Central-RT and Central-SW

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on Central-SW

a. Shut down all unused ports on Central-SW.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 211

Answers Key - 100% Score

Part 1: Build the Network

Placing Switch Central-SW and Router Central-RT to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (42)

Using Copper Straight-Through cable to connect User-A (FastEthernet0 port) and Central-SW (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (43)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (44)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (45)

Turn-on PCs and Router Central-RT
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (46)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address209.165.201.0/24
LAN 1 subnet host requirements29209.165.201.0/27
SM: 255.255.255.224
LAN 2 subnet host requirements17209.165.201.32/27
SM: 255.255.255.224
Central-RT G0/0/1First host address in LAN 1 subnet209.165.201.1
Central-RT G0/0/0First host address in LAN 2 subnet209.165.201.33
Central-SW SVISecond host address in LAN 1 subnet209.165.201.2
User-ALast host address in LAN 1 subnet209.165.201.30
User-BLast host address in LAN 2 subnet209.165.201.62

Using line console to connect User-A and Router
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (47)

Click to User-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (48)

Router Central-RT configuration script

enableconfigure terminal no ip domain-lookuphostname Central-RTbanner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 209.165.201.33 255.255.255.224no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 209.165.201.1 255.255.255.224no shutdown exitenable secret NoOneShouldKnowservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for Switch Central-SW

Then, using Console cable to connect User-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (49)

Switch Central-SW configuration script

enableconfigure terminal no ip domain-lookuphostname Central-SWbanner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 209.165.201.2 255.255.255.224no shutdown exitip default-gateway 209.165.201.1enable secret NoOneShouldKnowservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address209.165.201.30
Subnet Mask255.255.255.224
IPv4 Default Gateway209.165.201.1
PC-B Network Configuration
IPv4 Address209.165.201.62
Subnet Mask255.255.255.224
IPv4 Default Gateway209.165.201.33

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (50)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN Final Skills Exam (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (51)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1Router-A
S1Switch-A
PC-AHost-A
PC-BHost-B

Addressing Requirements Table

ItemRequirements
Network Address192.168.10.0/24
LAN 1 subnet host requirements100
LAN 2 subnet host requirements50
Router-A G0/0/1First host address in LAN 1 subnet
Router-A G0/0/0First host address in LAN 2 subnet
Switch-A SVISecond host address in LAN 1 subnet
Host-ALast host address in LAN 1 subnet
Host-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (52)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on Router-A and Switch-A
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the Router-A router and Switch-A switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 192.168.10.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 100 hosts and the smaller subnet (LAN 2) requires 50 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 192.168.10.0/24
  • Required number of hosts in IPv4 LAN 1: 100
  • Required number of hosts in IPv4 LAN 2: 50

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on Router-A G0/0/1
  • LAN 2 is hosted on Router-A G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to Switch-A SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on Router-A and Switch-A
b. Configure router hostname using the name Router-A.
c. Configure switch hostname using the name Switch-A.
d. Configure an appropriate banner on Router-A and Switch-A.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure Router-A G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the Switch-A VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on Router-A and Switch-A

Step 1: Configure enhanced password security

a. Configure ThisisaSecret as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on Router-A.

Step 2: Configure SSH on Router-A and Switch-A

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on Switch-A

a. Shut down all unused ports on Switch-A.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 020

Answers Key

Part 1: Build the Network

Placing Switch Switch-A and Router Router-A to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (53)

Using Copper Straight-Through cable to connect Host-A (FastEthernet0 port) and Switch-A (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (54)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (55)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (56)

Turn-on PCs and Router Router-A
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (57)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address192.168.10.0/24
LAN 1 subnet host requirements100192.168.10.0/25
SM: 255.255.255.128
LAN 2 subnet host requirements50192.168.10.128/26
SM: 255.255.255.192
Router-A G0/0/1First host address in LAN 1 subnet192.168.10.1
Router-A G0/0/0First host address in LAN 2 subnet192.168.10.129
Switch-A SVISecond host address in LAN 1 subnet192.168.10.2
Host-ALast host address in LAN 1 subnet192.168.10.126
Host-BLast host address in LAN 2 subnet192.168.10.190

Using line console to connect Host-A and Router
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (58)

Click to Host-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (59)

Router Router-A configuration script

enableconfigure terminal no ip domain-lookuphostname Router-Abanner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 192.168.10.129 255.255.255.192no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 192.168.10.1 255.255.255.128no shutdown exitenable secret ThisisaSecretservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for Switch Switch-A

Then, using Console cable to connect Host-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (60)

Switch Switch-A configuration script

enableconfigure terminal no ip domain-lookuphostname Switch-Abanner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 192.168.10.2 255.255.255.128no shutdown exitip default-gateway 192.168.10.1enable secret ThisisaSecretservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address192.168.10.126
Subnet Mask255.255.255.128
IPv4 Default Gateway192.168.10.1

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (61)

PC-B Network Configuration
IPv4 Address192.168.10.190
Subnet Mask255.255.255.192
IPv4 Default Gateway192.168.10.129

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (62)

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (63)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN Final Skills Exam (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (64)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1Router-A
S1Switch-A
PC-AHost-A
PC-BHost-B

Addressing Requirements Table

ItemRequirements
Network Address172.16.1.0/24
LAN 1 subnet host requirements60
LAN 2 subnet host requirements20
Router-A G0/0/1First host address in LAN 1 subnet
Router-A G0/0/0First host address in LAN 2 subnet
Switch-A SVISecond host address in LAN 1 subnet
User-ALast host address in LAN 1 subnet
User-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (65)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on Router-A and Switch-A
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the Router-A router and Switch-A switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 172.16.1.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 60 hosts and the smaller subnet (LAN 2) requires 20 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 172.16.1.0/24
  • Required number of hosts in IPv4 LAN 1: 60
  • Required number of hosts in IPv4 LAN 2: 20

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on Router-A G0/0/1
  • LAN 2 is hosted on Router-A G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to Switch-A SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on Router-A and Switch-A
b. Configure router hostname using the name Router-A.
c. Configure switch hostname using the name Switch-A.
d. Configure an appropriate banner on Router-A and Switch-A.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure Router-A G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the Switch-A VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on Router-A and Switch-A

Step 1: Configure enhanced password security

a. Configure NoOneShouldKnow as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on Router-A.

Step 2: Configure SSH on Router-A and Switch-A

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on Switch-A

a. Shut down all unused ports on Switch-A.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 120

Answers Key - 100% Score

Part 1: Build the Network

Placing Switch Switch-A and Router Router-A to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (66)

Using Copper Straight-Through cable to connect User-A (FastEthernet0 port) and Switch-A (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (67)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (68)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (69)

Turn-on PCs and Router Router-A
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (70)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address172.16.1.0/24
LAN 1 subnet host requirements60172.16.1.0/26
SM: 255.255.255.192
LAN 2 subnet host requirements20172.16.1.64/27
SM: 255.255.255.224
Router-A G0/0/1First host address in LAN 1 subnet172.16.1.1
Router-A G0/0/0First host address in LAN 2 subnet172.16.1.65
Switch-A SVISecond host address in LAN 1 subnet172.16.1.2
User-ALast host address in LAN 1 subnet172.16.1.62
User-BLast host address in LAN 2 subnet172.16.1.94

Using line console to connect User-A and Router
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (71)

Click to User-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (72)

Router Router-A configuration script

enableconfigure terminal no ip domain-lookuphostname Router-Abanner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 172.16.1.65 255.255.255.224no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 172.16.1.1 255.255.255.192no shutdown exitenable secret NoOneShouldKnowservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for Switch-A

Then, using Console cable to connect User-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (73)

Switch Switch-A configuration script

enableconfigure terminal no ip domain-lookuphostname Switch-Abanner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 172.16.1.2 255.255.255.192no shutdown exitip default-gateway 172.16.1.1enable secret NoOneShouldKnowservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address172.16.1.62
Subnet Mask255.255.255.192
IPv4 Default Gateway172.16.1.1
PC-B Network Configuration
IPv4 Address172.16.1.94
Subnet Mask255.255.255.224
IPv4 Default Gateway172.16.1.65

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (74)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN Final Skills Exam (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (75)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1Central-RT
S1Central-SW
PC-AUser-A
PC-BUser-B

Addressing Requirements Table

ItemRequirements
Network Address192.168.10.0/24
LAN 1 subnet host requirements100
LAN 2 subnet host requirements50
Central-RT G0/0/1First host address in LAN 1 subnet
Central-RT G0/0/0First host address in LAN 2 subnet
Central-SW SVISecond host address in LAN 1 subnet
User-ALast host address in LAN 1 subnet
User-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (76)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on Central-RT and Central-SW
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the Central-RT router and Central-SW switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 192.168.10.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 100 hosts and the smaller subnet (LAN 2) requires 50 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 192.168.10.0/24
  • Required number of hosts in IPv4 LAN 1: 100
  • Required number of hosts in IPv4 LAN 2: 50

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on Central-RT G0/0/1
  • LAN 2 is hosted on Central-RT G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to Central-SW SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on Central-RT and Central-SW
b. Configure router hostname using the name Central-RT.
c. Configure switch hostname using the name Central-SW.
d. Configure an appropriate banner on Central-RT and Central-SW.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure Central-RT G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the Central-SW VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on Central-RT and Central-SW

Step 1: Configure enhanced password security

a. Configure DontTellAnyone as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on Central-RT.

Step 2: Configure SSH on Central-RT and Central-SW

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on Central-SW

a. Shut down all unused ports on Central-SW.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 011

Answers Key

Part 1: Build the Network

Placing Switch Central-SW and Router Central-RT to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (77)

Using Copper Straight-Through cable to connect User-A (FastEthernet0 port) and Central-SW (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (78)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (79)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (80)

Turn-on PCs and Router Central-RT
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (81)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address192.168.10.0/24
LAN 1 subnet host requirements100192.168.10.0/25
SM: 255.255.255.128
LAN 2 subnet host requirements50192.168.10.128/26
SM: 255.255.255.192
Central-RT G0/0/1First host address in LAN 1 subnet192.168.10.1
Central-RT G0/0/0First host address in LAN 2 subnet192.168.10.129
Central-SW SVISecond host address in LAN 1 subnet192.168.10.2
User-ALast host address in LAN 1 subnet192.168.10.126
User-BLast host address in LAN 2 subnet192.168.10.190

Using line console to connect User-A and Router
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (82)

Click to User-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (83)

Router Central-RT configuration script

enableconfigure terminal no ip domain-lookuphostname Central-RTbanner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 192.168.10.129 255.255.255.192no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 192.168.10.1 255.255.255.128no shutdown exitenable secret DontTellAnyoneservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for Switch Central-SW

Then, using Console cable to connect User-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (84)

Switch Central-SW configuration script

enableconfigure terminal no ip domain-lookuphostname Central-SWbanner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 192.168.10.2 255.255.255.128no shutdown exitip default-gateway 192.168.10.1enable secret DontTellAnyoneservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address192.168.10.126
Subnet Mask255.255.255.128
IPv4 Default Gateway192.168.10.1

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (85)

PC-B Network Configuration
IPv4 Address192.168.10.190
Subnet Mask255.255.255.192
IPv4 Default Gateway192.168.10.129

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (86)

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (87)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN Final Skills Exam (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (88)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1Router-A
S1Switch-A
PC-AHost-A
PC-BHost-B

Addressing Requirements Table

ItemRequirements
Network Address192.168.10.0/24
LAN 1 subnet host requirements100
LAN 2 subnet host requirements50
Router-A G0/0/1First host address in LAN 1 subnet
Router-A G0/0/0First host address in LAN 2 subnet
Switch-A SVISecond host address in LAN 1 subnet
Host-ALast host address in LAN 1 subnet
Host-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (89)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on Router-A and Switch-A
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the Router-A router and Switch-A switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 192.168.10.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 100 hosts and the smaller subnet (LAN 2) requires 50 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 192.168.10.0/24
  • Required number of hosts in IPv4 LAN 1: 100
  • Required number of hosts in IPv4 LAN 2: 50

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on Router-A G0/0/1
  • LAN 2 is hosted on Router-A G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to Switch-A SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on Router-A and Switch-A
b. Configure router hostname using the name Router-A.
c. Configure switch hostname using the name Switch-A.
d. Configure an appropriate banner on Router-A and Switch-A.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure Router-A G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the Switch-A VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on Router-A and Switch-A

Step 1: Configure enhanced password security

a. Configure DontTellAnyone as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on Router-A.

Step 2: Configure SSH on Router-A and Switch-A

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on Switch-A

a. Shut down all unused ports on Switch-A.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 021

Answers Key

Part 1: Build the Network

Placing Switch Switch-A and Router Router-A to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (90)

Using Copper Straight-Through cable to connect Host-A (FastEthernet0 port) and Switch-A (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (91)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (92)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (93)

Turn-on PCs and Router Router-A
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (94)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address192.168.10.0/24
LAN 1 subnet host requirements100192.168.10.0/25
SM: 255.255.255.128
LAN 2 subnet host requirements50192.168.10.128/26
SM: 255.255.255.192
Router-A G0/0/1First host address in LAN 1 subnet192.168.10.1
Router-A G0/0/0First host address in LAN 2 subnet192.168.10.129
Switch-A SVISecond host address in LAN 1 subnet192.168.10.2
Host-ALast host address in LAN 1 subnet192.168.10.126
Host-BLast host address in LAN 2 subnet192.168.10.190

Using line console to connect Host-A and Router
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (95)

Click to Host-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (96)

Router Router-A configuration script

enableconfigure terminal no ip domain-lookuphostname Router-Abanner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 192.168.10.129 255.255.255.192no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 192.168.10.1 255.255.255.128no shutdown exitenable secret DontTellAnyoneservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for Switch Switch-A

Then, using Console cable to connect Host-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (97)

Switch Switch-A configuration script

enableconfigure terminal no ip domain-lookuphostname Switch-Abanner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 192.168.10.2 255.255.255.128no shutdown exitip default-gateway 192.168.10.1enable secret DontTellAnyoneservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address192.168.10.126
Subnet Mask255.255.255.128
IPv4 Default Gateway192.168.10.1

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (98)

PC-B Network Configuration
IPv4 Address192.168.10.190
Subnet Mask255.255.255.192
IPv4 Default Gateway192.168.10.129

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (99)

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (100)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN Final Skills Exam (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (101)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1Central-RT
S1Central-SW
PC-AUser-A
PC-BUser-B

Addressing Requirements Table

ItemRequirements
Network Address209.165.201.0/24
LAN 1 subnet host requirements29
LAN 2 subnet host requirements17
Central-RT G0/0/1First host address in LAN 1 subnet
Central-RT G0/0/0First host address in LAN 2 subnet
Central-SW SVISecond host address in LAN 1 subnet
User-ALast host address in LAN 1 subnet
User-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (102)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on Central-RT and Central-SW
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the Central-RT router and Central-SW switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 209.165.201.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 29 hosts and the smaller subnet (LAN 2) requires 17 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 209.165.201.0/24
  • Required number of hosts in IPv4 LAN 1: 29
  • Required number of hosts in IPv4 LAN 2: 17

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on Central-RT G0/0/1
  • LAN 2 is hosted on Central-RT G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to Central-SW SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on Central-RT and Central-SW
b. Configure router hostname using the name Central-RT.
c. Configure switch hostname using the name Central-SW.
d. Configure an appropriate banner on Central-RT and Central-SW.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure Central-RT G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the Central-SW VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on Central-RT and Central-SW

Step 1: Configure enhanced password security

a. Configure ThisisaSecret as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on Central-RT.

Step 2: Configure SSH on Central-RT and Central-SW

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on Central-SW

a. Shut down all unused ports on Central-SW.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 210

Answers Key - 100% Score

Part 1: Build the Network

Placing Switch Central-SW and Router Central-RT to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (103)

Using Copper Straight-Through cable to connect User-A (FastEthernet0 port) and Central-SW (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (104)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (105)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (106)

Turn-on PCs and Router Central-RT
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (107)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address209.165.201.0/24
LAN 1 subnet host requirements29209.165.201.0/27
SM: 255.255.255.224
LAN 2 subnet host requirements17209.165.201.32/27
SM: 255.255.255.224
Central-RT G0/0/1First host address in LAN 1 subnet209.165.201.1
Central-RT G0/0/0First host address in LAN 2 subnet209.165.201.33
Central-SW SVISecond host address in LAN 1 subnet209.165.201.2
User-ALast host address in LAN 1 subnet209.165.201.30
User-BLast host address in LAN 2 subnet209.165.201.62

Using line console to connect User-A and Router
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (108)

Click to User-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (109)

Router Central-RT configuration script

enableconfigure terminal no ip domain-lookuphostname Central-RTbanner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 209.165.201.33 255.255.255.224no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 209.165.201.1 255.255.255.224no shutdown exitenable secret ThisisaSecretservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for Switch Central-SW

Then, using Console cable to connect User-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (110)

Switch Central-SW configuration script

enableconfigure terminal no ip domain-lookuphostname Central-SWbanner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 209.165.201.2 255.255.255.224no shutdown exitip default-gateway 209.165.201.1enable secret ThisisaSecretservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address209.165.201.30
Subnet Mask255.255.255.224
IPv4 Default Gateway209.165.201.1
PC-B Network Configuration
IPv4 Address209.165.201.62
Subnet Mask255.255.255.224
IPv4 Default Gateway209.165.201.33

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (111)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN Final Skills Exam (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (112)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1Central-RT
S1Central-SW
PC-AUser-A
PC-BUser-B

Addressing Requirements Table

ItemRequirements
Network Address172.16.1.0/24
LAN 1 subnet host requirements60
LAN 2 subnet host requirements20
Central-RT G0/0/1First host address in LAN 1 subnet
Central-RT G0/0/0First host address in LAN 2 subnet
Central-SW SVISecond host address in LAN 1 subnet
User-ALast host address in LAN 1 subnet
User-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (113)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on Central-RT and Central-SW
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the Central-RT router and Central-SW switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 172.16.1.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 60 hosts and the smaller subnet (LAN 2) requires 20 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 172.16.1.0/24
  • Required number of hosts in IPv4 LAN 1: 60
  • Required number of hosts in IPv4 LAN 2: 20

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on Central-RT G0/0/1
  • LAN 2 is hosted on Central-RT G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to Central-SW SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on Central-RT and Central-SW
b. Configure router hostname using the name Central-RT.
c. Configure switch hostname using the name Central-SW.
d. Configure an appropriate banner on Central-RT and Central-SW.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure Central-RT G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the Central-SW VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on Central-RT and Central-SW

Step 1: Configure enhanced password security

a. Configure DontTellAnyone as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on Central-RT.

Step 2: Configure SSH on Central-RT and Central-SW

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on Central-SW

a. Shut down all unused ports on Central-SW.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 111

Answers Key - 100% Score

Part 1: Build the Network

Placing Switch Central-SW and Router Central-RT to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (114)

Using Copper Straight-Through cable to connect User-A (FastEthernet0 port) and Central-SW (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (115)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (116)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (117)

Turn-on PCs and Router Central-RT
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (118)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address172.16.1.0/24
LAN 1 subnet host requirements60172.16.1.0/26
SM: 255.255.255.192
LAN 2 subnet host requirements20172.16.1.64/27
SM: 255.255.255.224
Central-RT G0/0/1First host address in LAN 1 subnet172.16.1.1
Central-RT G0/0/0First host address in LAN 2 subnet172.16.1.65
Central-SW SVISecond host address in LAN 1 subnet172.16.1.2
User-ALast host address in LAN 1 subnet172.16.1.62
User-BLast host address in LAN 2 subnet172.16.1.94

Using line console to connect User-A and Router
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (119)

Click to User-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (120)

Router Central-RT configuration script

enableconfigure terminal no ip domain-lookuphostname Central-RTbanner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 172.16.1.65 255.255.255.224no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 172.16.1.1 255.255.255.192no shutdown exitenable secret DontTellAnyoneservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for Central-SW

Then, using Console cable to connect User-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (121)

Switch Central-SW configuration script

enableconfigure terminal no ip domain-lookuphostname Central-SWbanner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 172.16.1.2 255.255.255.192no shutdown exitip default-gateway 172.16.1.1enable secret DontTellAnyoneservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address172.16.1.62
Subnet Mask255.255.255.192
IPv4 Default Gateway172.16.1.1
PC-B Network Configuration
IPv4 Address172.16.1.94
Subnet Mask255.255.255.224
IPv4 Default Gateway172.16.1.65

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (122)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN Final Skills Exam (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers

Topology

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (123)

ITN Final PT Skills Assessment (PTSA)

Device Names Table

You will receive one of three possible scenarios. In order to use the logical topology diagram that is provided with the instructions, use the device names in the Device Names Table.

Topology Diagram NameYour Scenario Name
R1R1
S1S1
PC-APC-A
PC-BPC-B

Addressing Requirements Table

ItemRequirements
Network Address172.16.1.0/24
LAN 1 subnet host requirements60
LAN 2 subnet host requirements20
R1 G0/0/1First host address in LAN 1 subnet
R1 G0/0/0First host address in LAN 2 subnet
S1 SVISecond host address in LAN 1 subnet
PC-ALast host address in LAN 1 subnet
PC-BLast host address in LAN 2 subnet

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (124)
A few things to keep in mind while completing this activity:

  1. Do not use the browser Back button or close or reload any exam windows during the exam.
  2. Do not close Packet Tracer when you are done. It will close automatically.
  3. Click the Submit Assessment button in the browser window to submit your work.

Assessment Objectives

  • Part 1: Build the Network
  • Part 2: Develop an IP Addressing Scheme
  • Part 3: Configure Basic Device Settings
  • Part 4: Configure Security Settings on R1 and S1
  • Part 5: Configure the Hosts and Verify Connectivity

Instructions

In this assessment you will configure the R1 router and S1 switch, as you have done in the activities in this course. You will also connect two PCs using a switch and a router that are in the main wiring closet. You will subnet the 172.16.1.0/24 network to provide IPv4 addresses for two subnets that will support the required number of hosts. The larger subnet (LAN 1) requires 60 hosts and the smaller subnet (LAN 2) requires 20 hosts.

Part 1: Build the Network

a. Build the network according to the logical topology by placing the required equipment in the wiring closet equipment rack.
b. Cable the network devices in the closet as shown in the topology diagram.
c. Connect the hosts as shown in the topology diagram.

Part 2: Develop an IP Addressing Scheme

In this part of the assessment, you will develop an IP addressing scheme. You will subnet an IPv4 network to create two subnets with the required number of hosts. You will also subnet an IPv6 network. You will then assign the addresses according to the requirements below.

Work with the following information:

  • IPv4 Network: 172.16.1.0/24
  • Required number of hosts in IPv4 LAN 1: 60
  • Required number of hosts in IPv4 LAN 2: 20

a. Record your subnet assignments according to the following requirements.

1) Assign the first IPv4 address of each subnet to a router interface

  • LAN 1 is hosted on R1 G0/0/1
  • LAN 2 is hosted on R1 G0/0/0

2) Assign the last IPv4 address of each subnet to the PC NIC.
3) Assign the second IPv4 address of LAN 1 to S1 SVI.

Part 3: Configure Basic Device Settings

Network devices must be configured over a direct console connection. Connectivity between the hosts should be established.

Step 1: Configure Basic Settings

a. Disable DNS lookup on R1 and S1
b. Configure router hostname using the name R1.
c. Configure switch hostname using the name S1.
d. Configure an appropriate banner on R1 and S1.
e. Allow console logins with the password C@nsPassw!

Step 2: Configure Interfaces

a. Configure R1 G0/0/0 and G0/0/1 interfaces using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask

b. Configure the S1 VLAN 1 SVI interface using the addressing from the previous part of this assessment:

  • Interface description
  • IPv4 address / subnet mask
  • The switch should be reachable from devices on other networks.

Part 4: Configure Security Settings on R1 and S1

Step 1: Configure enhanced password security

a. Configure DontTellAnyone as the encrypted privileged EXEC password
b. Encrypt all plaintext passwords
c. Set minimum password length to 10 on R1.

Step 2: Configure SSH on R1 and S1

a. Configure netsec.com as the domain name
b. Configure a local user netadmin with the secret password Ci$co12345
c. Set login on vty lines to use local database.
d. Configure the vty lines to accept SSH access only.
e. Generate an RSA crypto key using 1024 bits modulus.

Step 3: Secure switch ports on S1

a. Shut down all unused ports on S1.
b. Enter descriptions for all unused switch ports to indicate that they are intentionally shutdown.

Part 5: Configure the Hosts and Verify Connectivity

Configure both hosts with the IPv4 addresses that were assigned in Part 2 of this assessment.
ID: 101

Answers Key - 100% Score

Part 1: Build the Network

Placing Switch S1 and Router R1 to wiring closet equipment rack.
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (125)

Using Copper Straight-Through cable to connect PC-A (FastEthernet0 port) and S1 (FastEthernet0/6 port)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (126)

Same as above, using Copper Straight-Through cable to connect all devices as shown in the topology diagram.

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (127)

ITN Final PT Skills Assessment (PTSA)

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (128)

Turn-on PCs and Router R1
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (129)

Part 2: Develop an IP Addressing Scheme

ItemRequirementsIPv4 Address
Network Address172.16.1.0/24
LAN 1 subnet host requirements60172.16.1.0/26
SM: 255.255.255.192
LAN 2 subnet host requirements20172.16.1.64/27
SM: 255.255.255.224
R1 G0/0/1First host address in LAN 1 subnet172.16.1.1
R1 G0/0/0First host address in LAN 2 subnet172.16.1.65
S1 SVISecond host address in LAN 1 subnet172.16.1.2
PC-ALast host address in LAN 1 subnet172.16.1.62
PC-BLast host address in LAN 2 subnet172.16.1.94

Using line console to connect PC-A and Router
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (130)

Click to PC-A --> Terminal app --> click OK
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (131)

Router R1 configuration script

enableconfigure terminal no ip domain-lookuphostname R1banner motd #Unauthorized access to this device is prohibited!#interface g0/0/0description Connect to Subnet Bip address 172.16.1.65 255.255.255.224no shutdown exitinterface g0/0/1description Connect to Subnet Aip address 172.16.1.1 255.255.255.192no shutdown exitenable secret DontTellAnyoneservice password-encryptionsecurity passwords min-length 10ip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024exitcopy running-config startup-config

Configuration for S1

Then, using Console cable to connect PC-B and Switch
To show Console port on Switch, Right click Switch --> Inspect Rear --> Console port
ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (132)

Switch S1 configuration script

enableconfigure terminal no ip domain-lookuphostname S1banner motd #Unauthorized access to this device is prohibited!#interface vlan 1description Switch Subnet Aip address 172.16.1.2 255.255.255.192no shutdown exitip default-gateway 172.16.1.1enable secret DontTellAnyoneservice password-encryptionip domain-name netsec.comusername netadmin secret Ci$co12345line console 0password C@nsPassw!loginexitline vty 0 15transport input sshlogin localexitcrypto key generate rsa1024int range f0/1 - 4, f0/7 - 24, g0/1 - 2description Unused switch portsshutdownendcopy running-config startup-config

Part 5: Configure the Hosts and Verify Connectivity

On PCs, go to Desktop tab --> IP Configuration menu

PC-A Network Configuration
IPv4 Address172.16.1.62
Subnet Mask255.255.255.192
IPv4 Default Gateway172.16.1.1
PC-B Network Configuration
IPv4 Address172.16.1.94
Subnet Mask255.255.255.224
IPv4 Default Gateway172.16.1.65

Download PDF & Packet Tracer files:

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (133)

ITN ( Version 7.00) - ITN Final PT Skills Assessment (PTSA)

1 file(s) 89.03 KB

Download

ITN (Version 7.00) Final PT Skills Assessment (PTSA) Exam Answers (2024)

References

Top Articles
Latest Posts
Article information

Author: Barbera Armstrong

Last Updated:

Views: 6060

Rating: 4.9 / 5 (79 voted)

Reviews: 86% of readers found this page helpful

Author information

Name: Barbera Armstrong

Birthday: 1992-09-12

Address: Suite 993 99852 Daugherty Causeway, Ritchiehaven, VT 49630

Phone: +5026838435397

Job: National Engineer

Hobby: Listening to music, Board games, Photography, Ice skating, LARPing, Kite flying, Rugby

Introduction: My name is Barbera Armstrong, I am a lovely, delightful, cooperative, funny, enchanting, vivacious, tender person who loves writing and wants to share my knowledge and understanding with you.